The Langley’s location connects two of Houston’s most prestigious neighborhoods, Boulevard Oaks and Southampton. The residential building is inspired by the classical architecture of the surrounding area and will cater to those who want the space and luxurious finishes of a custom-built home with the upscale amenities of a boutique style hotel.
This week of May 29 drilling equipment will be delivered to the site to begin the process of drilling foundation piles. Below are the on-site activities by week.
The Langley construction broke ground on May 15. Earthwork is estimated to continue on-site for the next three months. The equipment on-site will include bull dozers and excavators served by dump trucks to haul dirt away from the site. The week of May 29 drilling equipment will be delivered to the site to begin the process of drilling foundation piles. Below are the on-site activities by week.
May 22, 2023
Construction Activities 5/22-6/10
The Langley construction broke ground on May 15. Earthwork is estimated to continue on-site for the next three months. The equipment on-site will include bull dozers and excavators served by dump trucks to haul dirt away from the site. The week of May 29 drilling equipment will be delivered to the site to begin the process of drilling foundation piles. Below are the on-site activities by week.
The week of May 15, construction will begin in earnest with heavy equipment on site to begin earthwork. Dump trucks will arrive, be filled and leave the site.
May 15, 2023
The week of May 8 activities will continue with the removal of the existing fence and the installation of the construction fence which will block the sidewalk during construction. Also, noise and dust monitors will be installed on site.
May 8, 2023