The Langley’s location connects two of Houston’s most prestigious neighborhoods, Boulevard Oaks and Southampton. The residential building is inspired by the classical architecture of the surrounding area and will cater to those who want the space and luxurious finishes of a custom-built home with the upscale amenities of a boutique style hotel.

 

Construction Updates

Construction Activities 5/29-6/19/2023

This week of May 29 drilling equipment will be delivered to the site to begin the process of drilling foundation piles. Below are the on-site activities by week.

  • Week of 05/29:
    • Earthwork, moving dirt with onsite equipment while dump trucks haul dirt onsite.
    • Close sidewalk on Bissonnet and Ashby, install new temp fence.
  • Week of 06/05:
    • Earthwork, moving dirt with onsite equipment while dump trucks haul dirt onsite.
    • Install new utility lines onsite.
    • Install Security cameras
  • Week of 06/12:
    • Install new utility lines.
    • Begin drilling auger cast piles.
    • Auger Drill to be delivered and drill auger cast test pile.

The Langley construction broke ground on May 15. Earthwork is estimated to continue on-site for the next three months. The equipment on-site will include bull dozers and excavators served by dump trucks to haul dirt away from the site. The week of May 29 drilling equipment will be delivered to the site to begin the process of drilling foundation piles. Below are the on-site activities by week.

  • Week of 05/22:
    • Earthwork, moving dirt with onsite equipment while dump trucks haul dirt offsite.
  • Week of 05/29:
    • Earthwork, moving dirt with onsite equipment while dump trucks haul dirt offsite.
    • Auger Drill to be delivered and drill auger cast test pile completed.
  • Week of 06/05:
    • Earthwork, moving dirt with onsite equipment while dump trucks haul dirt
    • Begin drilling auger cast piles.
    • Periodic concrete trucks carrying grout to line holes.
    • Install Security cameras

May 22, 2023
Construction Activities 5/22-6/10

The Langley construction broke ground on May 15. Earthwork is estimated to continue on-site for the next three months. The equipment on-site will include bull dozers and excavators served by dump trucks to haul dirt away from the site. The week of May 29 drilling equipment will be delivered to the site to begin the process of drilling foundation piles. Below are the on-site activities by week.

  • Week of 05/22:
    • Earthwork, moving dirt with onsite equipment while dump trucks haul dirt offsite.
  • Week of 05/29:
    • Earthwork, moving dirt with onsite equipment while dump trucks haul dirt offsite.
    • Auger Drill to be delivered and drill auger cast test pile completed.
  • Week of 06/05:
    • Earthwork, moving dirt with onsite equipment while dump trucks haul dirt
    • Begin drilling auger cast piles.
    • Periodic concrete trucks carrying grout to line holes.
    • Install Security cameras

May 22, 2023

May 15, 2023

The week of May 15, construction will begin in earnest with heavy equipment on site to begin earthwork.  Dump trucks will arrive, be filled and leave the site.
May 15, 2023

May 8, 2023

The week of May 8 activities will continue with the removal of the existing fence and the installation of the construction fence which will block the sidewalk during construction. Also, noise and dust monitors will be installed on site.
May 8, 2023