- Week of 8/7:
TRAFFIC ALERT: As excavation of the rainwater detention tank continues, empty dump trucks will enter the site through an entrance on Ashby. The trucks will be loaded and exit onto Bissonnet ensuring traffic flow. Traffic control will be positioned at Ashby and Bissonnet for the safety of drivers entering Bissonnet from Ashby. This activity is scheduled throughout August.
- Earthwork, moving dirt with onsite equipment while dump trucks haul dirt.
- Install new utility lines.
- Drill auger cast piles with onsite rig, concrete trucks haul on to the site.
- Week of 08/14:
- Earthwork, moving dirt with onsite equipment while dump trucks haul dirt.
- Install new utility lines.
- Drill auger cast piles with onsite rig, concrete trucks haul on to the site.
- Week of 08/21:
- Earthwork, moving dirt with onsite equipment while dump trucks haul dirt.
- Install new utility lines.
- Drill auger cast piles with onsite rig, concrete trucks haul on to the site.
Planned construction activity for The Langley 6/26-7/15
- Week of 06/26:
- Earthwork, moving dirt with onsite equipment while dump trucks haul dirt onsite.
- Install new utility lines.
- Auger Drill to be delivered and drill auger cast piles.
- Drill auger cast piles with onsite rig, concrete trucks haul onsite.
- Install Security cameras
- Week of 07/03:
- Earthwork, moving dirt with onsite equipment while dump trucks haul dirt onsite.
- Install new utility lines.
- Drill auger cast piles with onsite rig, concrete trucks haul onsite.
- Week of 07/10:
- Earthwork, moving dirt with onsite equipment while dump trucks haul dirt onsite.
- Install new utility lines.
- Drill auger cast piles with onsite rig, concrete trucks haul onsite.
- Week of 06/12:
- Earthwork, moving dirt with onsite equipment while dump trucks haul dirt onsite.
- Install new utility lines.
- Week of 06/19:
- Earthwork, moving dirt with onsite equipment while dump trucks haul dirt onsite.
- Install new utility lines.
- Auger Drill to be delivered and drill auger cast piles.
- Drill auger cast piles with onsite rig.
- Week of 06/26:
- Earthwork, moving dirt with onsite equipment while dump trucks haul dirt onsite.
- Install new utility lines.
- Drill auger cast piles with onsite rig.
- Install Security cameras
Last week we received a call on our construction line requesting that we move a refueling tank away from the South fence line. It was moved the next day. Also we received a complaint regarding workers shouting at neighbors. We took this very seriously and have investigated it as best we can post event. What we’ve learned is there was a crew working on the sidewalk across from our property. They had several pickup trucks parked on Ashby and at one point during rush hour on Thursday had blocked Ashby. This crew was in no way associated with our work. We asked them to move their trucks and they shouted at us. It is our belief this was the source of the complaint. Nonetheless we have instructed crews to engage politely with neighbors and to direct them to call 346-595-1717 or email at [email protected] to resolve any issue. Thank you for calling our attention to these issues. Only when we know can we take action.
This week of June 5th the sidewalks on Bissonnet and Ashby will be closed and a new temporary fence will be installed. Below are the on-site activities by week.
- Week of 06/05:
- Earthwork, moving dirt with onsite equipment while dump trucks haul dirt onsite.
- Install new utility lines onsite.
- Close Bissonnet and Ashby sidewalks, install new temp fence.
- Week of 06/12:
- Earthwork, moving dirt with onsite equipment while dump trucks haul dirt onsite.
- Install new utility lines.
- Auger Drill to be delivered and drill auger cast test pile.
- Install Security cameras
- Week of 06/19:
- Earthwork, moving dirt with onsite equipment while dump trucks haul dirt onsite.
- Install new utility lines.
- Drill auger cast piles with onsite rig.